Ore Processing Plant

Online Service Connection < 60s Email Reply Time < 24h

Processing capacity: 0.2~8 m³/min (1-150 tph)

Applied material: Copper, Iron, Gold, Sliver, Zinc, Tin, Lead, Chrome ore, Nickel, Manganese, Tin Ore, etc.

Main equipment: Jaw crusher, impact crusher, hammer crusher, flotation machine, classifier, ball mill, concentrator, etc.

Email info@sinoftm.com

Ore processing plant means that extracts and purifies some elements in the raw ore through a series of complex ore beneficiation flow and professional beneficiation equipment to improve the ore grade of useful minerals. It is used for crushing, grinding, separating, washing, extracting, upgrading mineras ors and geting ore concentraction in ore dressing industry. 

Main Equipment of Ore Processing Plant

Ore processing plant is divided into magnetic separation, flotation separation and gravity concentration. 

Flotation seperation process is mainly used to select metal minerals such as gold, silver, copper, lead, zinc, nickel. It can also be used for the selection of ferrous and non-metallic (such as graphite).

Magnetic seperation is usded for wet magnetic separation of iron ore, magnetite, pyrrhotite, ilmenite, silica sand, with particle size under 3mm.

Gravity sepetation is suitable for the placer alluvial gold ore, rock gold, gold quartz ore, tin ore, chrome ore, managanese ore. 

Classification of Ore Beneficiation Plant

We suppply iron ore beneficiation plant, copper ore processing plant, gold ore processing plant, manganese ore separation plant, lead-zinc ore separation plant, phosphate processing plant, tin ore processing plant, silica sand processing plant, chrome ore beneficiation plant, nickel ore processing plant, etc. 

We can customized ore processing plant accoding to your mineral size, grade and budget cost, which will save your costs and maximize your benefits.

Ore Processing Plant Flow

Ore Processing Production Line

1. Mineral is crushed by jaw crusher into a reasonable fineness. Place an impact crusher for further crushing (<25mm), if necessary. After that the material will be sent to silos by the elevator.

2. The materials are evenly by feeder into the ball mill for the grinding process to 150-200 mesh.

3. The ores after fine grinding will enter into the spiral classifier to wash and classify the ore mixture.

4. After cleaning and grading, the ore will be sent to the flotation operation, magnetic separator, or shaking table (choose based on your ore category) for separation and upgrade process to get mineral concentrate.

5. To reduce the moisture of mineral concentrate, we use thickener or dryer to dry them. Through the above-mentioned flows, the dry concentrate are gained.

Quick Way To Get Price

Fote Heavy Machinery
杩斿洖椤堕儴
Back